The Mahdi Clinic is an 800 bed hospital, 15 stories above ground level, ground floor and 2 level basement. Each of the three wings of the hospital are stabilized using inverted V-bracing.
Damptech dampers are used to achieve the highest levels of seismic performance. The dampers significantly reduce the effective story displacements and accelerations felt by the patients and sensitive hospital equipment, and ensure the continued operation of the hospital. Completed in 2015, there are 348 Damptech dampers installed in this project.